| Item No. |
Qty |
Unit |
Description |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
|
Total Price |
Unit Cost |
Total Price |
| 1. |
1 |
LS |
Insurance, bonds, permits, and mobilization, for |
$13,468.00 |
$13,468.00 |
$10,750.00 |
$10,750.00 |
$35,000.00 |
$35,000.00 |
$65,500.00 |
$65,500.00 |
$25,000.00 |
$25,000.00 |
$10,000.00 |
$10,000.00 |
| 2. |
3600 |
VF |
Repair of sanitary sewer manholes, including surface preparation (cleaning and patching), sealing against inflow and infiltration (at bench, walls, pipes and joints), cementious lining 1-inch thick, bypass pumping as required, restoration of all disturbed ground surface areas, and before and after photos, complete as specified for |
$74.00 |
$266,400.00 |
$110.00 |
$396,000.00 |
$105.00 |
$378,000.00 |
$98.50 |
$354,600.00 |
$147.00 |
$529,200.00 |
$150.00 |
$540,000.00 |
| 3. |
5 |
EA |
Bench building within sanitary sewer manholes, complete as specified for |
$300.00 |
$1,500.00 |
$400.00 |
$2,000.00 |
$400.00 |
$2,000.00 |
$750.00 |
$3,750.00 |
$2,500.00 |
$12,500.00 |
$2,500.00 |
$12,500.00 |
| 4. |
422 |
EA |
Sealing between wall and rings of sanitary manholes from inflow and infiltration, complete as specified for |
$120.00 |
$50,640.00 |
$65.00 |
$27,430.00 |
$250.00 |
$105,500.00 |
$225.00 |
$94,950.00 |
$250.00 |
$105,500.00 |
$500.00 |
$211,000.00 |
| 5. |
422 |
EA |
Sealing between rings and cast iron frame of sanitary manholes from inflow and infiltration, complete as specified for |
$120.00 |
$50,640.00 |
$65.00 |
$27,430.00 |
$185.00 |
$78,070.00 |
$235.00 |
$99,170.00 |
$275.00 |
$116,050.00 |
$500.00 |
$211,000.00 |
| 6. |
422 |
EA |
Provide and install water tight inflow protectors at each manhole, complete as specified for |
$37.00 |
$15,614.00 |
$75.00 |
$31,650.00 |
$65.00 |
$27,430.00 |
$75.00 |
$31,650.00 |
$125.00 |
$52,750.00 |
$50.00 |
$21,100.00 |
| BASE BID TOTAL |
|
$398,262.00 |
|
$495,260.00 |
|
$626,000.00 |
|
$649,620.00 |
|
$841,000.00 |
|
$1,005,600.00 |
| SUPPLEMENTARY ITEMS |
|
|
|
|
|
|
|
|
|
|
|
|
| 1. |
1 |
EA |
For each cast iron manhole cover replacement, as approved by the Engineer |
$175.00 |
$175.00 |
$165.00 |
$165.00 |
$200.00 |
$200.00 |
$395.00 |
$395.00 |
$350.00 |
$350.00 |
$365.00 |
$365.00 |
| 2. |
1 |
EA |
For each cast iron manhole frame replacement, as approved by the Engineer |
$175.00 |
$175.00 |
$165.00 |
$165.00 |
$750.00 |
$750.00 |
$600.00 |
$600.00 |
$400.00 |
$400.00 |
$940.00 |
$940.00 |
| 3. |
1 |
EA |
For each elevation adjustment of existing manhole frame and cover to 4-inches above natural ground, as approved by the Engineer |
$200.00 |
$200.00 |
$235.00 |
$235.00 |
$425.00 |
$425.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$1,640.00 |
$1,640.00 |
| 4. |
1 |
EA |
For each new precast manhole on existing base, 4’ – 8’ depth, including reconnection of piping, sealing of pipes and joints, and trench safety measures, as approved by the Engineer |
$1,800.00 |
$1,800.00 |
$4,000.00 |
$4,000.00 |
$3,500.00 |
$3,500.00 |
$8,500.00 |
$8,500.00 |
$5,500.00 |
$5,500.00 |
$5,500.00 |
$5,500.00 |
| 5. |
1 |
EA |
For each new precast manhole on existing base, 8’ – 12’ depth, including reconnection of piping, sealing of pipes and joints, and trench safety measures, as approved by the Engineer |
$2,500.00 |
$2,500.00 |
$7,000.00 |
$7,000.00 |
$8,500.00 |
$8,500.00 |
$1,500.00 |
$1,500.00 |
$7,000.00 |
$7,000.00 |
$9,000.00 |
$9,000.00 |
| 6. |
1 |
EA |
For each new precast manhole on existing base, 12’ – 16’ depth, including reconnection of piping, sealing of pipes and joints, and trench safety measures, as approved by the Engineer |
$5,000.00 |
$5,000.00 |
$10,000.00 |
$10,000.00 |
$25,000.00 |
$25,000.00 |
$30,000.00 |
$30,000.00 |
$10,000.00 |
$10,000.00 |
$16,400.00 |
$16,400.00 |
| 7. |
1 |
EA |
For each new precast manhole on existing base, 16’ – 20’ depth, including reconnection of piping, sealing of pipes and joints, and trench safety measures, as approved by the Engineer |
$7,500.00 |
$7,500.00 |
$14,500.00 |
$14,500.00 |
$32,000.00 |
$32,000.00 |
$50,000.00 |
$50,000.00 |
$14,000.00 |
$14,000.00 |
$21,200.00 |
$21,200.00 |
| 8. |
1 |
EA |
For each additional new manhole bench on existing base, as approved by the Engineer |
$350.00 |
$350.00 |
$425.00 |
$425.00 |
$1,000.00 |
$1,000.00 |
$2,500.00 |
$2,500.00 |
$2,000.00 |
$2,000.00 |
$2,425.00 |
$2,425.00 |
| 9. |
1 |
EA |
For each removal of steel rings and replacement with concrete rings, as approved by the Engineer |
$250.00 |
$250.00 |
$235.00 |
$235.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,500.00 |
$1,500.00 |
$2,530.00 |
$2,530.00 |
| 10. |
1 |
EA |
For each removal an reinstallation of internal drop connections, as approved by the Engineer |
$400.00 |
$400.00 |
$150.00 |
$150.00 |
$3,500.00 |
$3,500.00 |
$1,500.00 |
$1,500.00 |
$3,500.00 |
$3,500.00 |
$1,700.00 |
$1,700.00 |
| |
|
|
Comments: |
Bidder #5: Written amount and numeric amount do not match on item 1. |
|
|
|
|
|
|