Date Last Edited  2/2/10

Ground Storage Tank Rehabilitation for

Northwest Harris County MUD No. 30

AEI Project #271-041-001
Bid Date: 2/2/10

Below  is a Preliminary Detailed Bid Tab showing the Apparent Low Bidder and Base Bid Amount indicated.    Indication of Apparent Low Bidder Does NOT constitute the Final Contract Award.  Selection of Contractor for Contract Award subject to Client Consideration / Approval.  This information Does NOT constitute Final Bid Tab, should you require this information, please contact AEI Engineering.
Comments:
 
 
Utility Services, Co.              Caldwell Tanks, Inc. Lassen, Inc. -  dba Mike Larsen Co         W.W. Payton Corporation             N.G. Painting, L.P.         Sherwin Williams - dba as William Painting & Sandblasting, Inc.          
Item No.  Qty  Unit Description  Unit Cost  Total Price Unit Cost  Total Price Unit Cost  Total Price Unit Cost  Total Price Unit Cost  Total Price Unit Cost  Total Price
1. 1 Ea Move-in and set-up, including all bonds, insurance, and permits, complete as specified, for the sum of  $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,380.00 $5,380.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $21,630.00 $21,630.00
2. 1 Ea Abrasive blast to SSPC-SP-10 and recoat interior of ground storage tank, including interior tank walls, center support, ladder, ceiling and supporting structures, piping and roof hatch, complete as specified, for the sum of  $57,500.00 $57,500.00 $71,400.00 $71,400.00 $71,725.00 $71,725.00 $60,000.00 $60,000.00 $70,000.00 $70,000.00 $88,452.00 $88,452.00
3. 1 Ea Replace roof vent, complete as specified for the sum of  $3,500.00 $3,500.00 $4,500.00 $4,500.00 $2,860.00 $2,860.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $3,880.00 $3,880.00
4. 1 Ea Recoat exterior of ground storage tank with a polyurethane top coat, complete as specified for the sum of  $13,000.00 $13,000.00 $8,000.00 $8,000.00 $14,289.00 $14,289.00 $35,000.00 $35,000.00 $30,000.00 $30,000.00 $24,600.00 $24,600.00
5. 1 Ea Water plant exterior spot repairs: spot grind and recoat up to twenty (20) square feet of external surfaces of tanks, fittings, piping, and other external surfaces with an intermediate mastic coat, complete as specified, for the sum of  $1,000.00 $1,000.00 $3,000.00 $3,000.00 $2,980.00 $2,980.00 $3,000.00 $3,000.00 $500.00 $500.00 $500.00 $500.00
6. 1 Ea Install stainless steel Saf-T-Climb device and rail on internal tank ladder, complete as specified, for the sum of  $1,700.00 $1,700.00 $1,200.00 $1,200.00 $2,240.00 $2,240.00 $4,000.00 $4,000.00 $5,000.00 $5,000.00 $6,800.00 $6,800.00
7. 1 Ea Pressure wash exterior surfaces and piping of the ground storage tank to remove chalking, dirt, mildew, and other surface deposits or stains, complete as specified for the sum of  $13,200.00 $13,200.00 $6,000.00 $6,000.00 $3,750.00 $3,750.00 $15,000.00 $15,000.00 $1,000.00 $1,000.00 $27,200.00 $27,200.00
8. 1 Ea Disinfect tank, including bacteriological testing, complete as specified for the sum of  $1,300.00 $1,300.00 $1,500.00 $1,500.00 $6,750.00 $6,750.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00
BASE BID TOTAL   $96,200.00   $100,600.00   $109,974.00   $130,000.00   $131,000.00   $174,562.00
           
SUPPLEMENTARY ITEMS:                        
1. 1 Ea For each additional square foot of exterior spot repairs in excess of twenty (20) square feet, add  $20.00 $20.00 $150.00 $150.00 $149.00 $149.00 $80.00 $80.00 $30.00 $30.00 $25.00 $25.00
2. 1 Ea For each cubic yard of sediment removal and disposal from the ground storage tank, add  $50.00 $50.00 $250.00 $250.00 $1,175.00 $1,175.00 $700.00 $700.00 $300.00 $300.00 $25.00 $25.00
3. 1 Ea For each square foot of tank wall and flood repair, including ¼- inch thick steel plate and welding, add $50.00 $50.00 $100.00 $100.00 $240.00 $240.00 $200.00 $200.00 $50.00 $50.00 $25.00 $25.00
SUPPLEMENTARY ITEMS TOTAL   $120.00   $500.00   $1,564.00   $980.00   $380.00   $75.00
Comments: