BIDDER #1 PM Construction & Rehab, L.P. |
BIDDER # 2 Reynolds Inliner, LLC |
BIDDER # 3 Insituform Technologies, Inc. |
BIDDER # 4 A & A Cable Contractors, Inc. |
BIDDER # 5 Horseshoe Construction, Inc. |
| BIDDER # 6 North Houston Pole Line, L.P. |
|
|
|
|
|
| Item No. |
Qty |
Unit |
Description |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
| 1. |
1 |
LS |
Move-in and setup, including bonds, insurance, and permits, complete as specified for |
$4,500.00 |
$4,500.00 |
$5,000.00 |
$5,000.00 |
$4,800.00 |
$4,800.00 |
$22,000.00 |
$22,000.00 |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$10,000.00 |
| 2. |
4 |
EA |
Internal obstruction removal of sanitary sewer line when pipe bursting is used, complete as specified for |
$500.00 |
$2,000.00 |
$500.00 |
$2,000.00 |
$1.00 |
$4.00 |
$245.00 |
$980.00 |
$500.00 |
$2,000.00 |
$275.00 |
$1,100.00 |
| 3. |
1 |
EA |
Remove and replace frame and lid to Sanitary Manhole No. 38. Provide and install bolted inflow preventer with gasket, complete as specified for |
$1,000.00 |
$1,000.00 |
$1,500.00 |
$1,500.00 |
$1,075.00 |
$1,075.00 |
$900.00 |
$900.00 |
$500.00 |
$500.00 |
$875.00 |
$875.00 |
| 4. |
1 |
EA |
Repair of sanitary manhole to a depth of 0-12’ including surface preparation (cleaning and patching), sealing against inflow and infiltration (at bench, walls, pipes, and joints), with cementious, lining 1-inch thick, restoration of all disturbed ground surface areas, and before and after photos, complete as specified for |
$2,000.00 |
$2,000.00 |
$1,500.00 |
$1,500.00 |
$2,150.00 |
$2,150.00 |
$1,980.00 |
$1,980.00 |
$1,500.00 |
$1,500.00 |
$1,056.00 |
$1,056.00 |
| 5. |
5 |
VF |
Extra depth, beyond 12’ depth, for repair of sanitary sewer manholes, including sealing against inflow and infiltration (at bench, walls, pipes, and joints), with cementious lining 1-inch thick, restoration of all disturbed areas, complete as specified for |
$200.00 |
$1,000.00 |
$125.00 |
$625.00 |
$90.00 |
$450.00 |
$165.00 |
$825.00 |
$90.00 |
$450.00 |
$88.00 |
$440.00 |
| 6. |
780 |
LF |
Pipe bursting of 6” sanitary sewer pipe and increase size to 8”, including pre-televising and post-televising, restoration of all disturbed areas, including but not limited to streets, curbs, driveways, landscaping, and other improvements, complete as specified for |
$31.00 |
$24,180.00 |
$35.00 |
$27,300.00 |
$34.50 |
$26,910.00 |
$32.00 |
$24,960.00 |
$33.00 |
$25,740.00 |
$35.54 |
$27,721.20 |
| 7. |
540 |
LF |
Pipe bursting of 8” sanitary sewer pipe including pre-televising and post-televising, traffic control, restoration of all disturbed areas including but not limited to streets, curbs, driveways, landscaping, and other improvements, complete as specified for |
$31.00 |
$16,740.00 |
$35.00 |
$18,900.00 |
$34.50 |
$18,630.00 |
$32.00 |
$17,280.00 |
$33.00 |
$17,820.00 |
$35.54 |
$19,191.60 |
| 8. |
3,760 |
LF |
Pipe bursting of 10” sanitary sewer pipe and increase size to 12”, including pre-televising and post-televising, traffic control, restoration of all disturbed areas including but not limited to streets, curbs, driveways, landscaping, and other improvements, complete as specified for |
$43.00 |
$161,680.00 |
|
$150,400.00 |
$51.00 |
$191,760.00 |
$38.00 |
$142,880.00 |
$73.20 |
$275,232.00 |
$44.43 |
$167,056.80 |
| 9. |
28 |
EA |
Service reconnections on 8” sanitary sewer related to pipe bursting (service connections to be located and relieved prior to pipe bursting) or remove and replace method, complete as specified for |
$374.00 |
$10,472.00 |
|
$19,600.00 |
$650.00 |
$18,200.00 |
$750.00 |
$21,000.00 |
$400.00 |
$11,200.00 |
$6,000.00 |
$168,000.00 |
| 10. |
44 |
EA |
Service reconnections on 12” sanitary sewer related to pipe bursting (service connections to be located and relieved prior to pipe bursting) or remove and replace method, complete as specified for |
$435.00 |
$19,140.00 |
|
$30,800.00 |
$650.00 |
$28,600.00 |
$2,500.00 |
$110,000.00 |
$800.00 |
$35,200.00 |
$650.00 |
$28,600.00 |
| 11. |
1 |
EA |
Point repair of 12” sanitary sewer lines, including dewatering, bedding, backfilling, by-pass pumping, traffic control, restoration of all disturbed areas including but not limited to streets, curbs, driveways, landscaping, and other improvements, and up to 20 linear feet of pipe per repair, complete as specified for |
$2,500.00 |
$2,500.00 |
$6,000.00 |
$6,000.00 |
$4,700.00 |
$4,700.00 |
$3,700.00 |
$3,700.00 |
$11,000.00 |
$11,000.00 |
$4,500.00 |
$4,500.00 |
| 12. |
1 |
LS |
Trench safety system, complete as specified for |
$4,000.00 |
$4,000.00 |
$1.00 |
$1.00 |
$1,350.00 |
$1,350.00 |
$1,500.00 |
$1,500.00 |
$3,000.00 |
$3,000.00 |
$55.00 |
$55.00 |
| 13. |
1 |
LS |
Bypass pumping for 6” sanitary sewer, complete as specified for |
$1,000.00 |
$1,000.00 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1,000.00 |
$1,000.00 |
$500.00 |
$500.00 |
$900.00 |
$900.00 |
| 14. |
1 |
LS |
Bypass pumping for 8” sanitary sewer, complete as specified for |
$1,000.00 |
$1,000.00 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1,000.00 |
$1,000.00 |
$500.00 |
$500.00 |
$1,000.00 |
$1,000.00 |
| 15. |
1 |
LS |
Bypass pumping for 12” sanitary sewer, complete as specified for |
$5,000.00 |
$5,000.00 |
$1.00 |
|
$1.00 |
$1.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
$1,200.00 |
$1,200.00 |
| BASE BID TOTAL |
|
$256,212.00 |
|
$263,629.00 |
|
$298,632.00 |
|
$352,505.00 |
|
$397,142.00 |
|
$431,695.60 |
| ALTERNATE NO. 1 BID ITEMS |
|
|
|
|
|
|
|
|
|
|
|
|
| 1. |
780 |
LF |
In lieu of Base Bide Item No. 6, Removal of 6” sanitary sewer pipe and replacement with 8” sanitary sewer pipe including pre-televising and post-televising, trench safety, dewatering, bedding, backfilling, traffic control, restoration of all disturbed areas including but not limited to streets, curbs, driveways, landscaping, fences and other improvements, complete in place |
$62.00 |
$48,360.00 |
$50.00 |
$39,000.00 |
$52.00 |
$40,560.00 |
$38.00 |
$29,640.00 |
|
$0.00 |
$90.71 |
$70,753.80 |
| 2. |
540 |
LF |
In lieu of Base Bid Item No. 7, Cured-in-place pipe lining of 8” liner, including cleaning, pre-televising and post-televising, complete in place |
$25.00 |
$13,500.00 |
$25.00 |
$13,500.00 |
$28.00 |
$15,120.00 |
$24.00 |
$12,960.00 |
|
$0.00 |
$24.20 |
$13,068.00 |
| 3. |
3,760 |
LF |
In lieu of Base Bid Item No. 8, Cured-in-place pipe lining of 10” liner, including cleaning, pre-televising and post-televising, complete in place |
$32.50 |
$122,200.00 |
$28.00 |
$105,280.00 |
$32.75 |
$123,140.00 |
$24.50 |
$92,120.00 |
|
$0.00 |
$27.50 |
$103,400.00 |
| 4. |
28 |
EA |
In lieu of Base Bid Item No. 9, service reconnections on 8” cured-in-place pipe, complete in place |
$125.00 |
$3,500.00 |
$100.00 |
$2,800.00 |
$25.00 |
$700.00 |
$150.00 |
$4,200.00 |
|
$0.00 |
$600.00 |
$16,800.00 |
| 5. |
44 |
EA |
In lieu of Base Bid Item No. 10, service reconnections on 10” cured-in-place pipe, complete in place |
$125.00 |
$5,500.00 |
$100.00 |
$4,400.00 |
$25.00 |
$1,100.00 |
$150.00 |
$6,600.00 |
|
$0.00 |
$650.00 |
$28,600.00 |
| 6. |
4 |
EA |
In lieu of Base Bid Item No. 2, internal obstruction removal of sanitary sewer line, when CIPP is used, complete in place |
$500.00 |
$2,000.00 |
$500.00 |
$2,000.00 |
$400.00 |
$1,600.00 |
$245.00 |
$980.00 |
|
$0.00 |
$330.00 |
$1,320.00 |
| TOTAL ALTERNATE NO. 1 BID |
|
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE NO. 2 BID ITEMS |
|
|
|
|
|
|
|
|
|
|
|
|
| 1. |
1,320 |
LF |
Clean and televise 8” sanitary sewer lines for 1-year warranty at 11-months, complete as specified for |
$3.35 |
$4,422.00 |
$4.00 |
$5,280.00 |
$1.30 |
$1,716.00 |
$2.45 |
$3,234.00 |
$2.50 |
$3,300.00 |
$2.20 |
$2,904.00 |
| 2. |
3,760 |
LF |
Clean and televise 10” sanitary sewer lines for 1-year warranty at 11-months, complete as specified for |
$3.35 |
$12,596.00 |
$5.00 |
$18,800.00 |
$1.30 |
$4,888.00 |
$2.75 |
$10,340.00 |
$4.00 |
$15,040.00 |
$2.20 |
$8,272.00 |
| 3. |
3,760 |
LF |
Clean and televise 12” sanitary sewer lines for 1-year warranty at 11-months, complete as specified for |
$3.35 |
$12,596.00 |
$6.00 |
$22,560.00 |
$1.30 |
$4,888.00 |
$3.00 |
$11,280.00 |
$4.00 |
$15,040.00 |
$2.20 |
$8,272.00 |
| TOTAL ALTERNATE NO. 2 BID |
|
|
|
|
|
|
|
|
|
|
|
|
| SUPPLEMENTARY ITEMS |
|
|
|
|
|
|
|
|
|
|
|
|
| 1. |
1 |
EA |
For each 30’ point repair in 8” sanitary sewer, all depths as approved by the Engineer |
$7,000.00 |
$7,000.00 |
$5,000.00 |
$5,000.00 |
$5,000.00 |
$5,000.00 |
$1,200.00 |
$1,200.00 |
$2,100.00 |
$2,100.00 |
$4,164.70 |
$4,164.70 |
| 2. |
1 |
EA |
For each 20’ point repair in 10” sanitary sewer, all depths, all lengths as approved by the Engineer |
$5,500.00 |
$5,500.00 |
$6,000.00 |
$6,000.00 |
$6,500.00 |
$6,500.00 |
$1,500.00 |
$1,500.00 |
$5,000.00 |
$5,000.00 |
$4,200.00 |
$4,200.00 |
| 3. |
1 |
EA |
For each 20’ point repair in 12” sanitary sewer, all depths, all lengths as approved by the Engineer |
$6,000.00 |
$6,000.00 |
$8,000.00 |
$8,000.00 |
$8,000.00 |
$8,000.00 |
$2,700.00 |
$2,700.00 |
$8,000.00 |
$8,000.00 |
$4,400.00 |
$4,400.00 |
| 4. |
1 |
LF |
Heavy cleaning for cast iron and ductile iron pipe per linear foot, as needed, as approved by Engineer |
$18.00 |
$18.00 |
$20.00 |
$20.00 |
$50.00 |
$50.00 |
$20.00 |
$20.00 |
$10.00 |
$10.00 |
$3.25 |
$3.25 |
| 5. |
1 |
LF |
For each linear foot of Trenching Dewatering, as approved by the Engineer |
$35.00 |
$35.00 |
$250.00 |
$250.00 |
$200.00 |
$200.00 |
$5.00 |
$5.00 |
$75.00 |
$75.00 |
$15.00 |
$15.00 |
| 6. |
1 |
EA |
Install stacks at locations where multiple connections exist, as directed by Engineer; stacks shall be capped and marked, complete as specified for |
$1,000.00 |
$1,000.00 |
$3,000.00 |
$3,000.00 |
$1,500.00 |
$1,500.00 |
$100.00 |
$100.00 |
$1,500.00 |
$1,500.00 |
$1,700.00 |
$1,700.00 |
| 7. |
1 |
LF |
For each linear foot of trench safety, as approved by the Engineer |
$10.00 |
$10.00 |
$25.00 |
$25.00 |
$10.00 |
$10.00 |
$2.00 |
$2.00 |
$1.00 |
$1.00 |
$10.00 |
$10.00 |
| 8. |
1 |
LF |
For each linear foot of abandonment and fill of sanitary sewer, as approved by the Engineer |
$20.00 |
$20.00 |
$100.00 |
$100.00 |
$30.00 |
$30.00 |
$3.50 |
$3.50 |
$7.00 |
$7.00 |
$95.00 |
$95.00 |
| |
|
|
Comments: |
1- Bidder #2, Reynold Inliner, LLC, had different numerical and written amounts for Base Bid Items No. 8, 9, and 10. Amount shown on bid tab is written amount. Base Bid Total was revised to reflect these changes. The correct Base Bid Total is shown on bid tab. |
2- Bidder #6, North Houston Pole Line, L.P., was disqualified because they failed to acknowledge Addendum No. 2. |