BIDDER #1 Natgun Corporation |
BIDDER # 2 Preload, Inc. |
|
|
|
|
| Item No. |
Qty |
Unit |
Description |
Unit Cost |
Total Price |
Unit Cost |
Total Price |
| 1. |
1 |
LS |
Move-in and set-up, including all bonds, insurance and permits, complete as specified for |
$13,400.00 |
$13,400.00 |
$7,600.00 |
$7,600.00 |
| 2. |
1 |
LS |
Vegetation stripping, complete in place as specified for |
$800.00 |
$800.00 |
$2,900.00 |
$2,900.00 |
| 3. |
1 |
EA |
Provide and install 500,000-gallon (58-ft diameter, 27.1-ft height) concrete storage tank with dome roof, coating, all appurtenances, and concrete foundation, including 350 CY of select fill, with tank disinfection and bacteriological testing, complete as specified for |
$503,700.00 |
$503,700.00 |
$699,000.00 |
$699,000.00 |
| 4. |
1 |
LS |
Storm water pollution prevention, including filter fabric fencing, stabilized construction exit and inlet protection barriers, complete in place as specified and shown on the plans for |
$5,900.00 |
$5,900.00 |
$6,900.00 |
$6,900.00 |
| 5. |
1 |
LS |
Provide and install designated plant yard piping, including thrust blocking and pipe supports, valves, fittings, coating and disinfection, complete as specified for |
$68,400.00 |
$68,400.00 |
$84,000.00 |
$84,000.00 |
| 6. |
1 |
LS |
Provide and install trench safety for plant piping, complete as specified for |
$1,000.00 |
$1,000.00 |
$600.00 |
$600.00 |
| 7. |
1 |
LS |
Provide and install 8’ intruder resistant wooden fencing with brick columns and gate, complete as specified and shown on plans for |
$38,200.00 |
$38,200.00 |
$31,400.00 |
$31,400.00 |
| 8. |
1 |
LS |
Provide and install 8’ intruder resistant chain link fencing with gate, complete as specified and shown on plans for |

|
$9,500.00 |
$9,600.00 |
$9,600.00 |
| 9. |
0.9 |
AC |
Hydro mulch seed disturbed areas within plant site, complete as specified for |
$1,800.00 |
$1,620.00 |
$1,800.00 |
$1,620.00 |
| 10. |
1 |
LS |
Site improvements including site grading, swales and clean-up, complete as specified and shown on plans for |
$6,300.00 |
$6,300.00 |
$11,100.00 |
$11,100.00 |
| 11. |
1 |
LS |
Provide and install all electrical work shown on plans and described in specifications including as follows: Provide and install conduits for equipment at ground storage tank, receptacle, ground wells for GST foundation, conduit marker for future work, and all appurtenances as shown on plans and as described in specifications for a complete operating system for |
$10,600.00 |
$10,600.00 |
$11,000.00 |
$11,000.00 |
| BASE BID TOTAL |
|
$659,420.00 |
|
$865,720.00 |
| ALTERNATE NO. 1 |
|
|
|
|
| 1. |
1 |
LS |
In lieu of Base Bid Item 7, construct an 8’ concrete fence with wooden appearance, with gate, complete as specified for |
$42,400.00 |
$42,400.00 |
$38,200.00 |
$38,200.00 |
| ALTERNATE NO. 1 TOTAL |
|
$42,400.00 |
|
$38,200.00 |
| BID TOTAL WITH ALTERNATE NO. 1 |
|
$663,620.00 |
|
$872,520.00 |
| BID TOTAL WITH NO PERMANENT FENCING |
|
$611,720.00 |
|
$824,720.00 |
| SUPPLEMENTARY ITEMS |
|
|
|
|
| 1. |
Add |
CY |
Site fill to grade shown on plans, complete as specified for |
$10.00 |
LEAVE BLANK |
$6.00 |
LEAVE BLANK |
| 2. |
Add/ Deduct |
CY |
For each cubic yard of select fill under ground storage tank more or less than the 350 CY included as incidental in Base Bid Item 3, complete as specified for |
$20.00 |
LEAVE BLANK |
$10.00 |
LEAVE BLANK |
| 3. |
Add |
EA |
Remove designated tree and dispose offsite, complete in place as specified and shown on the plans for |
$2,500.00 |
LEAVE BLANK |
$1,200.00 |
LEAVE BLANK |
| 4. |
25 |
LF |
Remove designated concrete curb, complete in place as shown on the plans for |
$10.00 |
$250.00 |
$12.00 |
$300.00 |
| |
|
|
Comments: |
1- Bidder #1, Natgun Corporation, did not multiply the unit cost by the quantity to get the total price. The corrected total is shown on bid tab. |